Colocation Racks

CityNet Data Center Colocation service available in Cairo, London, and Istanbul. Remote hands and hardware installation service included with all colocation plans. Peering available with major networks and service providers via DE-CIX
Single Server
1 U
1U Colocation Rack Space
1 Outlet APC Remote Reboot PDU
 KVM over IP on Demand
2 x 1Gb/s Network Ports
10 Mbit Committed Data Rate
/29 IP Address block (5 useable)
1 Amps 220V A/B AC Circuit
Double Height
2 U
2U Colocation Rack Space
2 Outlet APC Remote Reboot PDU
 KVM over IP on Demand
2 x 1Gb/s Network Ports
10 Mbit Committed Data Rate
/29 IP Address block (5 useable)
2 Amps 220V A/B AC Circuit
4 U Rack Space
4 U
4U Colocation Rack Space
2 Outlet APC Remote Reboot PDU
 KVM over IP on Demand
2 x 1Gb/s Network Ports
25 Mbit Committed Data Rate
/29 IP Address block (5 useable)
2 Amps 220V A/B AC Circuit
QUARTER RACK
10 U
10U Colocation Rack Space
4 Outlet APC Remote Reboot PDU
 KVM over IP on Demand
2 x 1Gb/s Network Ports
25 Mbit Committed Data Rate
/28 IP Address block (13 useable)
2 Amps 220V A/B AC Circuit
HALF Rack
21 U
21U Colocation Rack Space
8 Outlet APC Remote Reboot PDU
 KVM over IP on Demand
2 x 1Gb/s Network Ports
50 Mbit Committed Data Rate
/27 IP Address block (29 useable)
4 Amps 220V A/B AC Circuit
FULL Rack
42 U
42U Colocation Rack Space
16 Outlet APC Remote Reboot PDU
 KVM over IP on Demand
2 x 1Gb/s Network Ports
100 Mbit Committed Data Rate
/26 IP Address block (61 useable)
8 Amps 220V A/B AC Circuit
MULTIPLE Locations
CityNet provides hosting services at two data centers located at centralized points between Asia, Europe, and the Middle East. Turkey Data Center located in Istanbul, and Egypt Data Center located in Cairo.
Remote Hands
CityNet Host Data Center provides 24/7 Remote Hands.
Our goal is to provide the same or even greater provision than if you were using your own staff. Free remote hands provided with all colocation packages.
Guaranteed uptime
Guaranteed 99.9% service uptime. Our Data Center relies on our built-in redundancy for power, cooling, physical security, and network connectivity.
Migration Assistance
We understand that moving your equipment to a new colocation facility can be a complex and sometimes daunting task.
That’s why we offer free migration assistance to all customers moving their equipment to CityNet data center.

Frequently Asked Questions

How long does it take to get my colocation rack space set up?

Colocation Rack space orders delivered upon availability it could be delivered within 24 hours up to 7 Days for large projects with customized data center resources.

What is the minimum contract period?

All CityNet Host Colocation spaces are provided on a quarterly contracts.

Privacy Preferences
When you visit our website, it may store information through your browser from specific services, usually in form of cookies. Here you can change your privacy preferences. Please note that blocking some types of cookies may impact your experience on our website and the services we offer.